This letter presents a centralized underfrequency load-shedding (UFLS) scheme using the initial rate-of-change of frequency (ROCOF) to decide whether and how much load needs to be shed. The applicability of the centralized UFLS scheme is shown for a Spanish small isolated power system.
No takes yet. Share an insight, caveat, or question.
Lukas Sigrist (2014) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: