Underground subways are constructed in major cities across China to overcome the transportation problems in the urbanization process. The aim is to develop a comprehensive risk checklist associated with subway projects and a methodology to assess the risks at the early stage of a project. Based on the analysis of accidents that have happened in previous projects, a review of current literature and the results of interviews, a comprehensive risk checklist was developed, followed by proposing a risk analysis methodology using fuzzy analytical hierarchy process (AHP). Then the Nanjing Subway Line 2 project was analysed using the proposed risk checklist and fuzzy AHP method. The data were obtained through interviews and two rounds of questionnaire surveys with the personnel directly involved in the Nanjing Subway Line 2 project. The results of risk identification and assessment are presented and their managerial implications are discussed. The information presented here should be relevant to both academics and practitioners in the field of subway project management.
No takes yet. Share an insight, caveat, or question.
Zou et al. (2010) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: