This paper discusses the capacitated disassembly scheduling with parts commonality and start-up cost, which has broad applications in remanufacturing and many other production systems. The problem is formulated as a mixed-integer programming model. A Lagrangian heuristic is developed, where the lower bound problem reduces to a linear model, and the upper bound can be obtained with a two-stage procedure in polynomial time. The algorithm is tested on randomly generated problems. The results reveal that the approach outperforms CPLEX significantly for all the test instances, and for real-scale problem it provides sufficiently good solutions within acceptable time. Sensitivity studies on capacity, parts commonality and start-up cost are also conducted, which provide some useful insights for industrial managers. Moreover, a real-world case from a valve disassembly factory is studied, which illustrates the application of the proposed approach and gives managerial insights. Finally, conclusions are drawn and some potential extensions are discussed.
No takes yet. Share an insight, caveat, or question.
Ji et al. (2015) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: