:Scheduling planned maintenance activities is key to the success of Total Productive Maintenance (TPM) in reducing the mean and variability of production lead time. Most existing maintenance-scheduling models are risk-neutral, striving to control long-run costs. Some are variance-penalizing, addressing both average cost and cost variance. Neither addresses budget constraints. We present two models that use semi-variance combined with the mean to simultaneously optimize maintenance with respect to long-run costs and short-term budgets. The first model, geared for individual pieces of equipment (e.g., a pump or dryer), uses renewal theory. The second model presented is based on Markov decision processes and is appropriate for manufacturing systems composed of several units, any one of which can fail. An application of each model is presented. Beneficial operational costs variance is not penalized in this approach, which is more appropriate.
No takes yet. Share an insight, caveat, or question.
Gosavi et al. (2011) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: