Having established feasibility and developed a method to decompose control area's A~C~E~/sub 1/ into components attributable to load changes in subareas within the control area, this paper addresses some of the practical issues with an on-line implementation of the A~C~E~/sub 1/ model and the decomposition method. Issues examined here include time-varying system conditions, nonlinearities in the governors' dead bands and AGC loop, and the impact of load disturbance external to the control area. An on-line recursive parameter estimation technique with adjustable forgetting factor to update the A~C~E~/sub 1/ model parameters is proposed.
No takes yet. Share an insight, caveat, or question.
Hoonchareon et al. (2002) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: