Given the schedule pressure of lime-stabilized soil construction, many agencies specify the use of elevated temperature (e.g., 41°C), shorter duration (e.g., 5–7 days) accelerated specimen curing for unconfined compressive strength (qu) testing and acceptance as a proxy for qu of specimens normally cured under 28-day 23°C conditions. Moreover, lime and highway transportation industry associations prescribe a unique accelerated curing regime for all lime-stabilized soils (7-day, 41°C). This paper presents the results from a laboratory investigation of stress-strain-strength development of four lime-stabilized soils under 2–8 day 41°C accelerated curing and the 0–28 day 23°C normal curing regime. Specimens cured at 41°C reached qu values equivalent to 28-day 23°C qu after 1.8–5.9 days. Accordingly, 7-day 41°C curing overestimates 28-day normal cure qu by 13–260%. When combined with a detailed analysis of data available in the literature, the results illustrate that the prescription of a unique equivalent accelerated curing regime is oversimplified and can lead to significant overestimation of design qu.
No takes yet. Share an insight, caveat, or question.
Toohey et al. (2012) studied this question.