This paper presents two algorithms for scheduling a set of jobs with multiple priorities on non-homogeneous, parallel machines. The application of interest involves the tracking and data relay satellite system run by the US National Aeronautics and Space Administration. This system acts as a relay platform for Earth-orbiting vehicles that wish to communicate periodically with ground stations. The problem is introduced and then compared to other more common scheduling and routing problems. Next, a mixed-integer linear programming formulation is given but was found to be too difficult to solve for instances of realistic size. This led to the development of a dynamic programming-like heuristic and a greedy randomized adaptive search procedure. Each is described in some detail and then compared using data from a typical busy day scenario.
No takes yet. Share an insight, caveat, or question.
Rojanasoonthon et al. (2003) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: