The scheduling of tracking and surveillance looks for multifunction radar is considered. A technique called the sequential scheduler is proposed, whereby tracking looks and high-priority surveillance looks are scheduled first, and lower-priority surveillance looks are then scheduled to occupy gaps in the radar time line. A method called the two-slope benefit function (TSBF) sub-scheduler is used and requires that each tracking look and high-priority surveillance look has a benefit function, which specifies benefit as a function of start time. This method accounts for both look priority and target dynamics in formulating a look schedule. If the radar is overloaded with tracking look requests, the TSBF sub-scheduler down-selects a set of looks that can be scheduled, using a method that favours higher priority looks. Looks are scheduled to maximise the total benefit, and it is shown that the resulting maximisation is equivalent to a linear program which can be solved efficiently using the simplex method. A technique called the gap-filling sub-scheduler is used to schedule lower-priority surveillance looks. An example is presented which illustrates the properties of the sequential scheduler.
No takes yet. Share an insight, caveat, or question.
Peter W. Moo (2011) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: