International projects are different from general domestic ones. In order to analyse the differences, a tripartite game model is built up to describe the relationship among owner, supervisor and general contractor, and some measures are given for the owner to more effectively complete the project. In addition, a project schedule selection model is formulated and a new benefit allocation method is proposed by introducing a new modified Shapley value with weighted factor.
No takes yet. Share an insight, caveat, or question.
Ding et al. (2016) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: