The Compact Pulsed Hadron Source (CPHS) project that was launched in September 2009 at Tsinghua University has reached a first commissioning stage in conjunction with on-going activities to fulfill the eventual design goal of a ∼1013 n/s epithermal-to-cold neutron yield for education, instrumentation development, and industrial applications. Here, we report the latest progress on the design, fabrication, engineering of the 13 MeV/16 kW proton accelerator system, the neutron target station and neutron beamlines, especially regarding the successful delivery of the first 3-MeV proton beam and the realization of the first neutron generation in 2013.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2014) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: