Heat gain in the cold-water pipe (CWP) reduces the temperature span available to an ocean thermal energy conversion (OTEC) cycle. This study couples a transient finite-volume heat-transfer model to a quotation-based CWP cost indicator. Numerical convergence, boundary conditions and operating parameters were examined through independent solutions and sensitivity tests. For the 800 m, 2.0 m reference pipe with the low-conductivity annulus used in the calculation, the converged 24 h outlet temperature is 5.879 °C at a volumetric flow of 0.05 m 3 /s. The annulus limits the difference between the three pipe materials. HDPE retains the lowest cost indicator under the stated material-price scenarios. A separate, consistently coupled assessment at 8500–10000 kg/s uses constant DR = 26 and includes CWP pumping power. At 9500 kg/s, the 2.25 m candidate satisfies the selected 3 m/s velocity limit and gives a CWP cost indicator of about 16.1 USD/MWh; the 2.0 m candidate exceeds that limit. These results quantify the trade-off between intake heat gain, pumping demand and CWP cost for the prescribed temperature profile and tested design range.
No takes yet. Share an insight, caveat, or question.
Zhou et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: