Queue abstraction completeness—the degree to which a scheduling model observes the true state of a diagnostic waiting list—is rarely treated as a formal source of uncertainty in counterfactual scheduling evaluations. The framework characterises the ambiguity set of queue-state distributions induced by missing abstraction, derives a robust scheduling policy that minimises worst-case diagnostic delay, and establishes finite-sample bounds on the delay gap between the robust policy and its complete-information counterpart. A replication-based evaluation of the before-after-control-impact estimator was conducted under a declared variance structure (between-cluster SD = 6.0, residual SD = 4.5, intraclass correlation = 0.64), with power estimated across 2000 design cells for cluster counts of 8, 16, 24 and 32 and effect sizes of 3, 5 and 8 percentage points. The analysis indicates that 54 clusters are required for 80% power at a 5-percentage-point effect. The contribution is a formal treatment of abstraction completeness as a distributional ambiguity that propagates into delay estimates, together with a design-level characterisation of the cluster counts needed to detect clinically meaningful scheduling effects.
No takes yet. Share an insight, caveat, or question.
yaToivo et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: