Metropolitan development permit moratoria in Nairobi's peri-urban wards are drawn as boundary maps, and the freeze line is routinely treated as a sharp discontinuity in the regulatory environment that should produce a matching discontinuity in informal construction timing. Because no observational data on Nairobi permit records or construction starts are used, the study is a design-based evaluation: it characterises the operating characteristics of a before-after-control-impact estimator applied to a spatial running variable under a declared variance structure with an intraclass correlation of 0.64, a between-cluster standard deviation of 6.0 and a residual standard deviation of 4.5. Power was estimated across 2000 replications per design cell for cluster counts of 8, 16, 24 and 32 and effect sizes of 3, 5 and 8 percentage points. The analysis indicates that 54 clusters are required to detect a 5 percentage point discontinuity at 80 per cent power, a requirement that exceeds the 32-cluster maximum examined and that most ward-level moratorium evaluations cannot meet. The freeze line is better understood as a bundled institutional treatment than as a unidimensional regulatory cut, and it specifies the design conditions under which spatial regression discontinuity at moratorium boundaries can support causal claims about informal construction timing.
No takes yet. Share an insight, caveat, or question.
Nyakundi et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: