This study assesses the techno‐economic and environmental performance of large‐scale hybrid renewable energy systems in the Gulf Cooperation Council (GCC) region. A 3 GW hybrid solar‐wind plant comprising 1.5 GW of bifacial PV capacity and 1.5 GW of wind capacity was evaluated across five GCC sites: KSA, Oman, Kuwait, Qatar, and the UAE. Technical simulations used Meteonorm 8.2 meteorological data, PVsyst for bifacial PV modelling, and HOMER Pro for wind‐energy simulation and techno‐economic analysis over a 25‐year project lifetime. The assessment used a 5% discount rate and a 2% inflation rate. KSA achieved the highest annual renewable electricity generation and electricity exported to the grid, at 9594.7 and 9434.1 GWh/year, respectively, followed by Oman at 9287.7 and 9128.5 GWh/year. Grid‐delivered levelised cost of energy (LCOE) ranged from $0.0262/kWh in KSA to $0.0396/kWh in the UAE, with Oman, Kuwait, and Qatar at $0.0271/kWh, $0.0352/kWh, and $0.0371/kWh, respectively. Reported NPC ranged from $4805.3 million to $9271.1 million, with a payback period of 4.03–6.28 years. Annual avoided CO2 emissions ranged from 2.29 to 5.21 Mt/yr, corresponding to 55.4−126.8 Mt over 25 years. Overall, KSA and Oman demonstrated the strongest technical and cost performance, highlighting the importance of site‐specific renewable resource conditions for large‐scale hybrid PV‐wind deployment across the GCC.
No takes yet. Share an insight, caveat, or question.
Sawafi et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: