We consider a generalization of the fixed job schedule problem where a bound is imposed on the total working time of each processor. It is shown that the problem is NP-hard but polynomially solvable in the preemptive case. We introduce several lower bounds. One is determined through definition of a special class of graphs, for which the maximum clique problem is shown to be polynomial. Lower bounds and dominance criteria are exploited in a branch-and-bound algorithm for optimal solution of the problem. The effectiveness of the algorithm is analyzed through computational experiments.
No takes yet. Share an insight, caveat, or question.
Fischetti et al. (1989) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: