Background: Mechanised check basin formation offers a means of preparing earthen bunds for in situ rainwater conservation, but the operating performance of the MPKV hydraulic check basin former requires evaluation under local field conditions. Aims: To evaluate the field performance of the MPKV hydraulic check basin former under different operating conditions. Study Design: A split-split plot design with three replications was used, with three levels each of forward speed (2, 3 and 4 km/h), soil moisture content (12, 15 and 20% dry basis) and basin distance (4, 5 and 6 m). Place and Duration of Study: The field experiment was conducted during the academic year 2025–26 at the instructional farm of the Faculty of Agricultural Engineering, Indira Gandhi Krishi Vishwavidyalaya, Raipur, Chhattisgarh, India. Methodology: Machine performance was assessed in clay soil (Vertisol) in terms of bund height, effective working width, theoretical field capacity, effective field capacity, field efficiency, wheel slip and fuel consumption. Results: Bund height ranged from 167.17 to 180.67 mm, with the maximum at 3 km/h, 15% soil moisture and 6 m basin distance. Mean effective working width at 2, 3 and 4 km/h was 1.970, 2.076 and 1.929 m, respectively. Theoretical field capacity ranged from 0.40 to 0.80 ha/h and effective field capacity from 0.30 to 0.77 ha/h; the highest mean effective field capacity was 0.681 ha/h at 4 km/h. Field efficiency ranged from 76.60 to 97.30%, wheel slip from 3.41 to 5.41%, and average fuel consumption was 3.11 l/h (6.10 l/ha). Conclusion: The MPKV hydraulic check basin former performed satisfactorily under the evaluated field conditions, although operating settings should be selected according to the desired bund geometry and field capacity.
No takes yet. Share an insight, caveat, or question.
Naik et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: