Hard point-of-interconnection (POI) export limits can strand otherwise-available photovoltaic (PV) energy unless battery storage is dispatched with sufficient anticipation and under physically consistent constraints.This study evaluates a constraint-audited receding-horizon dispatch framework for curtailment recovery at an anonymized 230 MW utility-scale PV plant with a modeled 195.5 MW export cap and a nominal 30 MW/140 MWh battery energy storage system (BESS).The mixed-integer model predictive controller enforces BESS power and energy limits, charge-discharge exclusivity, no grid charging, forecast-dependent discharge headroom, first-action receding-horizon execution, and a common 50%-to-50% terminal-energy protocol.Twelve rolling monthly folds from September 2024 to August 2025 are evaluated against cap-only operation and a protocol-matched perfect-information Oracle.Cap-only operation curtails 26,279 MWh (4.9872% of evaluated PV energy).A transparent 72 h Diurnal model predictive control (MPC) reduces curtailment to 11,719.454MWh, recovers 14,559.546MWh, and closes 98.450% of the modeled cap-only-to-Oracle recoverable-energy opportunity; the matched Oracle curtails 11,490.175MWh.All 3 h closed-loop trajectories satisfy the modeled export cap, BESS limits, terminal equality, charge-discharge exclusivity, discharge-headroom rule, and no-grid-import condition.A matched information-sensitivity analysis then compares History-CatBoost and Weather-CatBoost under the same controller.Weather-CatBoost lowers daylight mean absolute error (MAE) by 2.225 MW at 24 h and 1.175 MW at 72 h relative to History-CatBoost, while annual curtailment is 288.601MWh higher at 24 h and 99.699 MWh lower at 72 h; the monthly block-bootstrap intervals include zero in both cases.Histogram gradient boosting (HGB) robustness and BESS-sensitivity results further show that the incremental control value of weather information is model-and configuration-dependent.Under the tested plant, cap, BESS, 3 h resolution, horizon, and terminal protocol, physically constrained anticipatory dispatch captures most of the modeled recoverable curtailed energy, leaving comparatively limited residual opportunity for additional forecast sophistication.
No takes yet. Share an insight, caveat, or question.
Jendeya et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: