Answers are grounded in this paper and cite their sources.
Gavdos is assessed as a non-interconnected island without mainland electricity exchange over the adopted planning horizon. A configuration with 340 kWp of photovoltaics, an 800 kW wind turbine, and surplus-fed electrolysis is evaluated for electricity supply and ferry hydrogen. Twelve public HEDNO monthly day-ahead files were concatenated into an 8760 h rolling-year demand series. RETScreen-based F-chart solar calculations and a Weibull wind distribution (k = 2) provided twelve representative monthly 24 h renewable profiles, mapped by month and hour to the dispatch chronology. Renewable generation first serves demand; deficits are assigned to conventional generation and surplus to electrolysis. Annual demand is 662.630 MWh, of which renewables supply 650.633 MWh directly (98.19%); the residual deficit is 11.997 MWh across 419 h. The 302.6 kW baseline electrolyzer produces 34.488 t H2 year−1 gross versus a ferry demand of 33.890 t H2 year−1. Although daily production is lower than demand in 130 days, accumulated hydrogen keeps the gross inventory non-negative. The maximum seasonal drawdown is 947.4 kg, giving a usable hydrogen-mass requirement of 1133.1 kg including a two-day reserve. The results demonstrate gross-production compatibility under the adopted assumptions; net ferry-fuel adequacy requires detailed assessment of component operation, auxiliary loads, storage, delivery, and vessel duty.
No takes yet. Share an insight, caveat, or question.
Pasinios et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: