Answers are grounded in this paper and cite their sources.
The area-wide installation of smart meters in low-voltage (LV) grids prospectively provides information about the relevant operational system parameters. Under the condition of neglecting the house to grid connection lines, a positive local measurement redundancy at every network node is obtainable. In general, this enables the implementation of special three-phase LV state estimation (SE) systems with the ability of bad data detection. In the future, such SE systems might be the basis for closed-loop network control systems without any operator interventions. This study proposes a concept for an LV SE system based on smart meter data. In contrast to other approaches, a linear SE algorithm is used, so that the SE system is not prone to convergence issues. Input variables are voltage and current magnitudes as well as active and reactive currents. The bad data detection process is generally based on the well-known method of normalised residuals. To ensure network topologies are also correctly applied in meshed networks, a novel algorithm for detecting topology faults is used. The presented results gathered from simulations and a field test are promising, showing appropriate accuracies and bad data detection probabilities especially for voltage magnitude and active current bad data.
No takes yet. Share an insight, caveat, or question.
Waeresch et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: