Answers are grounded in this paper and cite their sources.
Routine production reports separate pit haulage, equipment hours, material classes and crusher feed, potentially obscuring the source of short-term losses. We developed a source-audited diagnostic workflow using 19 consecutive daily report packages from an anonymised open-pit operation. Reconciliation provided 38 pit shifts, 18 daily fleet-hour observations and 34 matched pit–crusher shifts. Same-shift total loads and crusher tally were weakly associated (Pearson r = 0.108, p = 0.543); ore-based proxies showed similarly weak relationships. Threshold screening identified five discordant shifts, three of which met a stricter median-absolute-deviation (MAD) criterion. In the strongest upstream case, low fleet-hour coverage coincided with near-median crusher feed, while loads per active truck-hour remained comparable to reference shifts. In three downstream cases, reduced crusher tally coincided with maintenance/STOP annotations while pit haulage continued. These annotations provide internal documentary concordance, not independent validation. A nine-day single-truck outage offered asset-reliability context without a clear fleet-hour or night crusher-feed collapse. Under hypothetical input changes of up to 20%, four events retained their threshold classifications, although the upstream MAD-core event lost that status at 10%. The workflow identifies recorded pit–crusher mismatches without establishing inventory buffering, material rerouting or other causal mechanisms.
No takes yet. Share an insight, caveat, or question.
Saleem et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: