Key points are not available for this paper at this time.
The availability of large GTO thyristors has made advanced state VAr generators (ASVGs) competitive with their conventional counterparts. An ASVG substitutes silicon for large passive components. A description is given of a +or-1 MVAr prototype ASVG that was developed to prove the basic principles and verify performance under practical operating conditions. The prototype has been operating at the host utility site, Orange and Rockland Utilities Inc., Spring Valley, NY, since October 1986. An overview of the electrical and mechanical configuration and the test results are given.>
Building similarity graph...
Analyzing shared references across papers
Loading...
C. Edwards
Transpower (New Zealand)
K.E. Mattern
E.J. Stacey
IEEE Transactions on Power Delivery
Westinghouse Electric (United States)
Building similarity graph...
Analyzing shared references across papers
Loading...
Edwards et al. (Fri,) studied this question.
synapsesocial.com/papers/6a1e7c8f40bc8a3dd768f5ee — DOI: https://doi.org/10.1109/61.193963
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: