Key points are not available for this paper at this time.
The ELSP is a time-honored problem that “has been around” since 1915. It is the problem of accommodating cyclical production patterns when several products are made on a single facility. Recent contributions to its resolution resulted in either analytical approaches to a restricted problem, or heuristic approaches to the entire problem. This paper reviews critically the various contributions to the problem, and extends the analysis in the following four directions: An improved analytical approach A test for feasibility, A systematic means for escape from infeasibility, and A procedure for the determination of a basic period for a given set of multipliers to achieve a feasible schedule.
Building similarity graph...
Analyzing shared references across papers
Loading...
Salah E. Elmaghraby
North Carolina State University
Management Science
North Carolina State University
Building similarity graph...
Analyzing shared references across papers
Loading...
Salah E. Elmaghraby (Wed,) studied this question.
synapsesocial.com/papers/6a0c79005712c53037e8aa96 — DOI: https://doi.org/10.1287/mnsc.24.6.587