The watching brief monitored the machine excavation of a 7m long trench to a depth of 1.5m and a 1m x 1.5m test pit to a depth of 1.7m. Only modern waste and demolition rubble was observed, overlying probable agricultural loams and oily gravels at about 39.8m AOD.
M Learey (Wed,) studied this question.