Effectively managing risks I infrastructure construction projects is acknowledged as a crucial management process necessary for achieving project objectives related to time ,cost, quality ,and scope. This paper seeks to identify and analyze the risks associated with infrastructure projects. Though a thorough evaluation of contract conditions, this paper categorizes risks into eight distinct types. Qualitative risk analysis reveals that opposition from social entities, design modification, and work suspension significantly impact project objectives. The study has identified several recommendations for mitigating risks in construction projects. Contracts documents survey has essential tools of work risk management, and it is imperative for clients. Contractors and investors to implement a risk management policy throughout the project’s duration. In conclusion it essential for clients a, designer, contractors and government agency to collaborate from the feasibility’s stage onward to effectively address potential risk in a timely manner.
Building similarity graph...
Analyzing shared references across papers
Loading...
Dr. Jamadar Shahida Abdulrahim
Rayat Shikshan Sanstha
Building similarity graph...
Analyzing shared references across papers
Loading...
Dr. Jamadar Shahida Abdulrahim (Fri,) studied this question.
www.synapsesocial.com/papers/69d0af83659487ece0fa57e6 — DOI: https://doi.org/10.5281/zenodo.18479026