Key points are not available for this paper at this time.
It has come to the attention of the publisher that the article Ren X, Zhang X, Tian J, Lin F (2026), “Risk transmission and control in the prefabricated construction multi-project supply chain network: a SIS modeling approach”. Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-05-2025-0883, has been published with repeated references and its respective citation.The incorrect reference is:Liu, X.N., Meng, J.N., Wang, J.Y. and Ji, Y.B. (2024), “Influencing factors and improvement strategies of supply chain resilience of prefabricated construction from the perspective of dynamic capabilities: the case of China”, Engineering Construction and Architectural Management, Vol. 32 No. 5, pp. 3465-3494, doi: https://doi.org/10.1108/ecam-09-2023-0956The citation is incorrectly updated as “Liu et al., 2024” and it should be “Liu et al., 2025”.The publisher asks that references be entered correctly at submission and confirmed at article proofing stage.
Building similarity graph...
Analyzing shared references across papers
Loading...
Engineering Construction & Architectural Management
Building similarity graph...
Analyzing shared references across papers
Loading...
A Tue, study studied this question.
www.synapsesocial.com/papers/6a06b7a1e7dec685947aa5b7 — DOI: https://doi.org/10.1108/ecam-05-2026-0849
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: