PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
March 12, 20260 citationsOpen Access

Time-Series Forecasting Model Evaluation for Risk Reduction in Industrial Machinery Fleets of Kenya: A Methodological Approach

View Full Paper
WOWambugu OndiekiKNKipkemei NgugiNKNgina Kamau

Key Points

  • The aim is to evaluate a time-series forecasting model for predicting equipment failures in industrial machinery fleets in Kenya.
  • Developed a time-series forecasting model using historical failure data.
  • Utilized autoregressive integrated moving average (ARIMA) methodology for predictions.
  • Assessed model accuracy and established a confidence interval of ±10%.
  • The ARIMA model achieved an accuracy rate of 85% in predicting equipment failures.
  • Forecasting can significantly reduce operational risks and improve maintenance planning.

Abstract

Industrial machinery fleets in Kenya face significant operational risks that can lead to downtime and increased maintenance costs. Effective risk reduction strategies are essential for improving fleet reliability and efficiency. A time-series forecasting model was developed using historical failure data from Kenyan industrial machinery fleets. The model incorporates autoregressive integrated moving average (ARIMA) methodology to forecast future equipment failures with a confidence interval of ±10%. The ARIMA model demonstrated an accuracy rate of 85% in predicting equipment failures, indicating that it can effectively reduce the risk associated with industrial machinery operations in Kenya. This study highlights the utility of time-series forecasting models for improving maintenance planning and reducing operational risks in Kenyan industrial machinery fleets. The ARIMA model provides a robust framework for future research and application. Industrial operators should consider implementing the proposed time-series forecasting model to enhance their fleet management strategies and achieve greater reliability and cost savings. ARIMA, Time-Series Forecasting, Industrial Machinery, Risk Reduction, Maintenance Planning The maintenance outcome was modelled as Y₈ₓ=₀+₁X₈ₓ+uᵢ+₈ₓ, with robustness checked using heteroskedasticity-consistent errors.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Ondieki et al. (2011) studied this question.

synapsesocial.com/papers/69b2581996eeacc4fcec7732https://doi.org/10.5281/zenodo.18927240
Ask AI
Helpful
Bookmark
Share
View Full Paper