Construction materials are the primary source of embodied carbon in long-span bridge projects, particularly for steel-intensive structures. This study presents an empirical construction-stage carbon footprint assessment of the Anhsin Bridge, an asymmetric cable-stayed steel truss bridge in Taiwan. Using the emission factor method in accordance with ISO 14067 and Taiwan Environmental Protection Administration guidelines, a cradle-to-gate (A1–A5 equivalent) system boundary was applied, covering material production, transportation, and on-site construction activities. Total construction-stage emissions were estimated at 55,349 tCO2e, dominated by structural steel (51.8%), followed by reinforcing steel, concrete, and cement. Material-related emissions accounted for over 90% of the total, highlighting the critical role of material selection in embodied carbon reduction. Three practical mitigation strategies were evaluated using verified project data, as follows: 40% cement substitution with supplementary cementitious materials, optimized steel erection methods, and enhanced reuse of formwork and temporary works. The combined scenario achieved a 7.3% reduction in construction-stage emissions without compromising constructability. The findings demonstrate the effectiveness of material-oriented, constructability-aware strategies for reducing embodied carbon in steel-intensive bridge construction.
Liu et al. (Fri,) studied this question.