Multi-criteria decision-making assesses emergency lighting systems in offshore platforms, indicating improved safety and compliance.
This study evaluates the feasibility and benefits of adopting the IEC 62034:2012 standard for Automatic Testing Systems (ATS) for emergency and escape lighting on the BorWin5 High Voltage Direct Current (HVDC) offshore converter platform. The system comprises approximately 1,800 luminaires from multiple manufacturers that are integrated into an open-architecture 220 VDC emergency network. A Multi-Criteria Decision-Making (MCDM) approach was employed to assess the suitability of four configurations, ranging from manual testing to fully automated, centrally powered systems, based on technical, economic and operational criteria. The chosen solution, combining centralised power with automated testing and real-time monitoring, represents a significant advancement in offshore safety infrastructure. Implementing this solution on BorWin5 enhanced reliability and maintainability while ensuring compliance with international standards, supporting a projected service life of over 30 years for an emergency and escape lighting system in an extreme marine environment. The findings offer a scalable model for future offshore platforms operating in similarly challenging conditions.
No takes yet. Share an insight, caveat, or question.
Rodríguez et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: