This analysis demonstrates improved quality compliance and cost savings in building decoration, indicating effective management strategies.
This study systematically explores the refined strategies for construction management in building decoration and renovation projects, establishing a comprehensive management system that includes process control and quality assurance. By integrating BIM technology with intelligent tool development, the study achieved an improvement in construction quality compliance to 98.7%, a reduction in project delay rate to 1.2%, and a comprehensive cost savings of 12.7%. The “3D Standards + Five-Dimensional Monitoring” method proposed in the study effectively addresses the unique challenges of decoration projects. A total of 128 quality control points and dynamic early warning mechanisms form a replicable management paradigm, providing technical support for the industry’s implementation of the “14th Five-Year Plan for the Construction Industry.”
No takes yet. Share an insight, caveat, or question.
Weifang Zhu (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: