This analysis highlights hydraulic modeling and trenchless crossings in Hillsborough County's pipeline project, suggesting valuable insights for future designs.
Hillsborough County, Florida's One Water Program included the design, permitting, and construction of the South County Potable Water Transmission Main (SCPWTM), which included approximately 10.6 mi. of 42-in. and 48-in. diameter pipeline in the southern portion of the county. Freese and Nichols, Inc. (FNI) provided specialty engineering services to the design-build team for the project, including the performance of hydraulic modeling and surge analyses for the entire pipeline as well as design of the trenchless crossings along the route. The following paper discusses the highlights and lessons learned from these specialty engineering services.