Cost estimates are often prepared for pipeline projects at multiple design stages (conceptual, intermediate, and final). For some owners, design estimates at the conceptual stage are used as a basis for determining a portion of their annual budgets. As a result, the accuracy of early estimates becomes important for Owners, Engineers, Contractors, and the public. Projects, which require public approval and voting frequently, rely on the accuracy of cost estimates to determine if a proposed project should be approved or rejected. Anticipated costs of a project change as a project design evolves—and project scope, pipe alignment, or pipe capacity may need to be revised depending on funding availability. This paper provides recommendations to pipeline designers and engineers for improving the accuracy of cost estimates at various stages during design. This includes strategies for the following cost estimate components: including a reasonable level of effort for the cost estimator in the project's design budget, insights for preparing efficient quantity takeoffs, initial project discussion suggestions with the estimator, selecting lump sum vs. unit price bid forms, navigating difficult material pricing, and the level of accuracy to expect at different design stages. Further, we will explore the value of, and need for, a Basis of Estimate Report to accompany each cost estimate. Preparation of cost estimates frequently leads to discussions that improve the design—such as value engineering (reducing the overall project cost), alternative material selection, alignment adjustments, and clarifications to improve the specifications and/or drawings. Whether your organization has a professional cost estimator on staff, you work with an outside organization for cost estimating services, or your designers/engineers develop the cost estimate—the information presented in this paper should benefit all individuals who perform or manage cost estimating for pipeline projects.
No takes yet. Share an insight, caveat, or question.
O’Farrell et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: