Analysis reveals critical strategies for successful well abandonment in deepwater fields, highlighting risk management and innovative techniques.
The Bonga deepwater field stands as a notable example, having produced over one billion barrels of oil since its inception in 2005. With more than 70 wells consisting of oil producers and water injectors drilled, the field's development strategy incorporated a robust abandonment plan, ensuring compliance with company's standards and local regulatory requirements. Over the last four years, the company's wells delivery team successfully abandoned 26 wells across three Plug and Abandonment (P&A) campaigns. These operations presented unique challenges, including complex well configurations and complications from previous failed interventions, which left tools and wireline conveyance equipment downhole. Addressing these challenges required a combination of meticulous planning, innovative technological applications, and the integration of diverse expertise from the well delivery team and service partners. This paper underscores the critical impact of proactive planning and accumulated experience in the successful execution of complex well abandonment. By leveraging insights from earlier abandonment campaign operations and incorporating industry best practices, the team implemented comprehensive front-end engineering design (FEED), rigorous risk assessments, and tailored operational strategies. Advanced techniques such as blind back-out fishing methods, including electric-line powered tools for debris removal, and downhole imaging systems were deployed to overcome significant barriers. Furthermore, collaborative workshops and an integrated team approach were instrumental in developing robust solutions for complex well abandonment.
No takes yet. Share an insight, caveat, or question.
Okosun et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: