This project details the relocation of utilities during a diversion, highlighting HDD's role and challenges faced.
The realignment of State Highway LA-39, integral to a Mississippi River Sediment Diversion project, necessitated the relocation of critical utilities. This presentation will detail our approach to relocating 1,700 linear ft of 12″ water main and 2″ gas main while maintaining service to existing customers and accommodating new infrastructure. A key component of our strategy involved a 600-ft Horizontal Directional Drilling (HDD) installation beneath the newly constructed Diversion Channel. This technique allowed us to achieve the necessary clearance for both water and gas mains without disrupting the channel's integrity. The project's complexity was further heightened by the need to integrate utility services for a new operations and maintenance building within the realigned corridor. This paper describes the specific challenges encountered, such as maintaining minimum separation between water and gas lines within a confined right-of-way and ensuring adequate depth for the HDD installation to prevent future conflicts with the diversion channel. It also discusses the design considerations for the tie-ins to existing infrastructure and the methods employed to minimize service interruptions during cutover operations.
No takes yet. Share an insight, caveat, or question.
Clark et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: