Simulation analysis compares techniques for managing switching overvoltage in no-load transmission lines, suggesting effective solutions.
Switching overvoltage is closely related to the development of the power grid. In recent years, the rated voltage, line length, and transmission capacity of the power grid have been increasing, and the resulting switching overvoltage has become more serious. By using the simulation software ATP-EMTP to make the simulation model, this paper simulates the overvoltage generated by the opening and closing of the no-load line, including the simulation of the no-load line closing in different periods, adding an arrester and opening and closing resistance to limit the overvoltage. By comparing the simulation images, the limiting effects of different measures on switching overvoltage are compared.
No takes yet. Share an insight, caveat, or question.
Gao et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: