Answers are grounded in this paper and cite their sources.
Observational analysis shows magnitude estimates miscalculate consequences in earthquakes, highlighting their urgency.
Near-real-time magnitude, M1, estimates for earthquakes are strongly different from M2, the final estimate, as a function of magnitude band and time. For potentially fatal earthquakes, M1 estimates are approximately correct for the bands M2 < 7.0. For the band 7.0 ≤ M ≤ 7.9, M1 is approximately equal to M2 since October 2015. For great earthquakes with M2 > 8.2, M1 is always strongly underestimated, leading to initial underestimates of the earthquake consequences. These underestimates are due to saturation of the magnitude scale used in near-real-time estimates of earthquake size. If source parameter estimates based on records by local to regional seismograph networks were accepted, then manual quantitative estimates of fatalities and other consequences could be issued at least 15 min earlier than the current 25 min delay.
No takes yet. Share an insight, caveat, or question.
Max Wyss (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: