Answers are grounded in this paper and cite their sources.
This analysis identifies risk sources and suggests mitigation strategies for a 50 MW solar power plant in Indonesia, highlighting renewable energy benefits.
The establishment of a Solar Power Plant (PLTS) in IKN (Ibu Kota Nusantara) Indonesia is grounded in the vision of IKN as a sustainable World City, which emphasizes the implementation of new and renewable energy sources within the IKN region. Based on this, the Government is building a Solar Photovoltaic (PV) type Solar Power Plant (PLTS) with a capacity of 50 MW. To ensure that PLTS construction runs smoothly, according to expectations and with minimal risks, risk management analysis is needed. The aim of this research is to determine the source of risk and propose risk mitigation. The method used is interviews and direct observation. The research results show that there are 15 priority risk sources and 3 mitigation actions that can be proposed to overcome priority risk sources.
No takes yet. Share an insight, caveat, or question.
Zainal et al. (2025) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: