Research demonstrates improved oil production with optimized horizontal section length in a reservoir, suggesting economic benefits.
The primary contradiction in mature oilfields during the high water-cut stage is the uneven vertical water drive, which prevents the effective utilization of residual oil in the upper part of thick sand bodies at small scales. To address this issue, ultra-short-radius horizontal wells are employed to establish large-diameter oil flow channels within the reservoir, thereby achieving precise exploitation of this type of residual oil. Optimizing the length of the horizontal section is a critical issue in the development of small-scale residual oil, but conventional methods for optimizing the length of horizontal sections cannot be directly applied to ultra-short-radius horizontal wells (USRHWs). Therefore, utilizing reservoir seepage mechanics theory, the reservoir numerical simulation method was employed to investigate variations in daily and cumulative oil production for different horizontal section lengths. The theoretical upper limit of the optimal horizontal section length for actual injection and production well patterns was determined. Considering the coupled flow characteristics in the bottom water drive reservoir formation and wellbore, as well as the impact of friction losses caused by the relative roughness of the pipe wall under turbulent flow conditions on productivity, a mathematical model was established for the optimal length of the horizontal section of USRHWs, and the technological optimal value was determined. On this basis, fully accounting for the influence of drilling costs and oil prices on the optimization of the horizontal section length, an economic model for optimizing horizontal section length was established, and we comprehensively determine the optimal length of horizontal sections from multiple perspectives, including simulation, technology, and economics. The effectiveness of this method was validated by the processing results of actual reservoir parameters and the production performance after drilling.
No takes yet. Share an insight, caveat, or question.
Wen et al. (2025) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: