Answers are grounded in this paper and cite their sources.
This method minimizes test time in interposer-based 2.5D ICs, highlighting advanced algorithms and efficiency.
2.5D integrated circuits (ICs), which utilize an interposer to stack multiple dies side by side, represent a promising architecture for improving system performance, integration density, and design flexibility. However, the complex interconnect structures present significant challenges for post-fabrication testing, especially when scheduling test paths under constrained test access mechanisms. This paper addresses the test-path scheduling problem in interposer-based 2.5D ICs, aiming to minimize both total test time and cumulative inter-die interconnect length. We propose an efficient orthogonal learning-based differential evolution algorithm, named OLELS-DE. The algorithm combines the global optimization capability of differential evolution with an orthogonal learning-based search strategy and an elites local search strategy to enhance the convergence and solution quality. Comprehensive experiments are conducted on a set of benchmark instances with varying die counts, and the proposed method is compared against five state-of-the-art metaheuristic algorithms and CPLEX. Experimental results demonstrate that OLELS-DE consistently outperforms the competitors in terms of test cost reduction and convergence reliability, confirming its robustness and effectiveness for complex test scheduling in 2.5D ICs.
No takes yet. Share an insight, caveat, or question.
Li et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: