Answers are grounded in this paper and cite their sources.
This research finds a 54.5% reduction in completion time for manufacturing tasks, suggesting that multi-agent scheduling improves resource efficiency.
As the global manufacturing industry’s transformation accelerates toward being intelligent, “unmanned”, and low-carbon, manufacturing workshops face conflicts between production schedules and transportation tasks, leading to low efficiency and resource waste. This paper presents a multi-agent collaborative scheduling optimization method based on a hybrid game–genetic framework to address issues like high AGV (Automated Guided Vehicle) idle rates, excessive energy consumption, and uncoordinated equipment scheduling. The method establishes a trinity system integrating distributed decision-making, dynamic coordination, and environment awareness. In this system, the multi-agent decision-making and collaboration process exhibits significant symmetry characteristics. All agents (machine agents, mobile agents, etc.) follow unified optimization criteria and interaction rules, forming a dynamically balanced symmetric scheduling framework in resource competition and collaboration, which ensures fairness and consistency among different agents in task allocation, path planning, and other links. An improved best-response dynamic algorithm is employed in the decision-making layer to solve the multi-agent Nash equilibrium, while the genetic optimization layer enhances the global search capability by encoding scheduling schemes and adjusting crossover/mutation probabilities using dynamic competition factors. The coordination pivot layer updates constraints in real time based on environmental sensing, forming a closed-loop optimization mechanism. Experimental results show that, compared with the traditional genetic algorithm (TGA) and particle swarm optimization (PSO), the proposed method reduces the maximum completion time by 54.5% and 44.4% in simple scenarios and 57.1% in complex scenarios, the AGV idling rate by 68.3% in simple scenarios and 67.5%/77.6% in complex scenarios, and total energy consumption by 15.7%/10.9% in simple scenarios and 25%/18.2% in complex scenarios. This validates the method’s effectiveness in improving resource utilization and energy efficiency, providing a new technical path for intelligent scheduling in manufacturing workshops. Meanwhile, its symmetric multi-agent collaborative framework also offers a reference for the application of symmetry in complex manufacturing system optimization.
No takes yet. Share an insight, caveat, or question.
Xie et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: