Answers are grounded in this paper and cite their sources.
This analysis reveals significant improvements in total weighted flow time and energy cost in flow shop scheduling, indicating HGRASP's effectiveness over traditional MILP methods.
Efficient production scheduling is a key challenge in industrial operations and continues to attract significant interest within the field of operations research. This paper investigates a range of methodological approaches designed to solve the permutation flow shop scheduling problem (PFSP) with sequence-dependent setup times (SDST). The main objective is to minimize the total weighted flow time (TWFT) while ensuring a no-wait production environment. The proposed solution strategy is based on using algorithms with a mixed integer linear programming (MILP) formulation, heuristics, and their combination. The heuristics utilized in this paper include an advanced greedy randomized adaptive search procedure (GRASP) based on a priority rule and Hybrid-GRASP-NEH (HGRASP), where Nawaz-Enscore-Ham (NEH) takes place to initiate solutions, based on iterative global and local search methods to refine exploration capabilities and improve solution quality. These approaches were validated using a comprehensive set of experiments across diverse instance sizes that proved the efficiency of HGRASP, with the results showing a high-performance level that closely matched that of the exact MILP approach. Statistical analysis via the Friedman test (χ2 = 46.75, p = 7.04 × 10−11) confirmed significant performance differences among MILP, GRASP, and HGRASP. While MILP guarantees theoretical optimality, its practical effectiveness was limited by imposed computational time constraints, and HGRASP consistently achieved near-optimal solutions with superior computational efficiency, as demonstrated across diverse instance sizes.
No takes yet. Share an insight, caveat, or question.
Mimouni et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: