This analysis reveals a multi-agent control system that improves predictive maintenance for heating equipment, suggesting enhanced efficiency.
The article analyzes various types of repairs for process control system (PCS) equipment. A three-level intelligent system is proposed, designed to predict maintenance schedules for automated equipment. The principles of operation of an urban gas boiler house are examined, along with the structure and interaction of the proposed system's levels. As part of the study, a mimic diagram was developed for dispatcher monitoring of key boiler house equipment using MasterSCADA 4D software. A multi-agent approach was applied to solve predictive maintenance and repair tasks.
No takes yet. Share an insight, caveat, or question.
Makarovsky et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: