Field monitoring reveals settlement guidelines in active pile foundations during tunnel construction, suggesting better stress management.
The active pile underpinning technology when a tunnel passes under a bridge involves complex force conditions, making construction monitoring and control extremely challenging. However, there is a lack of research on the laws governing the stress and deformation responses of bridges during the construction process. This paper takes an active pile underpinning project of a metro line passing under a bridge as a case study. Design and construction plans are taken as the basis, and on-site monitoring data are incorporated. A three-dimensional finite element simulation model is established. This model is used to analyze the distribution and variation laws of stress and settlement during the pile underpinning process. The results show that: considering the traffic conditions of the bridge and the requirements for additional stress, it is reasonable to suggest that the actual settlement of the bridge deck should be 2–3 mm; the determination of the jacking force should generally be greater than the load transmitted from the pier column to the underpinning beam and less than 75% of the maximum bearing capacity, which is more reasonable.
No takes yet. Share an insight, caveat, or question.
Xu et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: