Answers are grounded in this paper and cite their sources.
Observational analysis shows reduced time in the redzone for personnel using pre-installed cable protectors, indicating significant safety improvements.
Completions today will commonly use cross coupling cable protectors to support and protect cables and control lines being deployed as part of the completion. Installing these cable protectors typically requires multiple personnel working in the redzone for 1 or more minute at each tubing joint. Many operators seek new methods and procedures to reduce or eliminate personnel activity in the redzone. A new style of cable protector, that is pre-installed on tubing offline, has been developed to greatly reduce personnel activity in the redzone. This paper looks at the use of these pre-installed cable protectors (PICP) and quantifies the safety improvements they provide including a reduction in the number of personnel and the amount of time they are exposed to work in the redzone as well as speeding up run-in-hole (RIH) operations and saving rig time and costs.
No takes yet. Share an insight, caveat, or question.
Bibby et al. (2025) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: