Answers are grounded in this paper and cite their sources.
Mixed-methods research identifies barriers and strategies for adopting BIM in facility management, suggesting improvements.
Building Information Modelling (BIM) can greatly improve the efficiency of building operations, the management of assets over their entire life cycle, and decision-making based on data. But in Malaysia, the use and implementation of BIM for FM is still limited, especially in the early stages of building projects. The goal of this study is to create a strategic framework that will help facility management organizations in Malaysia start using BIM-FM together. The study uses a mixed-methods research design that includes a systematic literature review, semi-structured interviews with FM professionals, and a quantitative survey to look at the current state of BIM adoption in the Malaysian FM sector, including current practices, problems, and readiness levels. Key findings show that even though more people are learning about BIM, it is still hard to use because of technological, organizational, and knowledge-based barriers. The study finds that early collaboration with stakeholders, building digital skills, and leadership commitment are all important for successful integration. The resulting conceptual framework gives Malaysian FM organizations a strategic way to start using BIM at the planning and design stages of projects management. This study adds to the growing conversation about how to combine BIM and FM by putting global knowledge into a local context and making practical suggestions for changes in policy, education, and business.
No takes yet. Share an insight, caveat, or question.
Ariffin et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: