Authors
Loading...
This case study demonstrates a 63% reduction in blasting vibration for tunnel construction, highlighting advanced numerical simulation and real-time monitoring.
Huang et al. (2025) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: