Answers are grounded in this paper and cite their sources.
An algorithm calculates operating time before failure in servo drives, suggesting enhanced durability indicators and reliability.
An algorithm for calculating the operating time before failure of a servo drive reducer during its operation is proposed. The results of operating time calculation, performed using a method that differs from the known ones by representing the failure rate of a power reducer as the sum of two components proportional to the square and logarithm of the torque at the reducer output, are presented. The proposed approach will allow moving from the concept of operating servo drives according to the assigned resource to the concepts of operation according to predicted indicators of failure-free operation and durability. Keywords operating time before failure, power reducer, torque at the reducer output, mechanical power, proba bility of failure, calculation algorithm
No takes yet. Share an insight, caveat, or question.
A 2025 study studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: