Answers are grounded in this paper and cite their sources.
Simulation reveals that effective evacuation timing and methods can significantly reduce fatalities, indicating better planning strategies.
This study quantitatively examined the number of fatalities and evacuation completion rate by simulating a tsunami evacuation based on the Great East Japan Earthquake in the Shishiori district of Kesennuma City, Miyagi Prefecture, using different scheduled evacuation start times and areas. As people perceive risk differently and congestion may adversely impact the number of fatalities and evacuation completion rate, investigating efficient evacuation methods by considering various evacuation start times and areas is necessary. Simulation results revealed that for simultaneous evacuation, the number of fatalities increased, and the evacuation completion rate decreased with slower evacuation start times. For time-delayed evacuation, the number of fatalities decreased, and the completion rate increased more than that of simultaneous evacuation. Moreover, the separate-area evacuation was effective as it reduced the number of fatalities and increased the evacuation completion rate compared to the time-delayed evacuation alone. Furthermore, it was more effective to set the line of division by distance from the coastline rather than elevation. Therefore, when planning an evacuation, dividing the evacuation start area is an important means to relieve congestion.
No takes yet. Share an insight, caveat, or question.
Kanemura et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: