Observational analysis shows consistency in partial discharge trends using bushing current transformers, indicating a novel approach for monitoring at ultra high voltage installations.
Partial discharge (PD) monitoring is critical for ensuring the safe and stable operation of transformers and shunt reactors. Developing a non-invasive PD monitoring method applicable to both offline and online scenarios can significantly enhance operational safety. Conventional bushing current transformers (BCTs), primarily designed for power-frequency current measurement, exhibit topological similarities to Rogowski coils commonly used for high-frequency current sensing. The authors have verified their high-frequency current sensing capability. Diagnostic PD test data from an ultra-high-voltage shunt reactor (returned to the factory due to acetylene generation) at an ultra high voltage(UHV)substation demonstrate that bushing CTs exhibit consistent variation trends with conventional high-frequency current transformers (HFCTs) installed at the core and clamping structures. The correlation coefficient R 2 between the two exceeds 0.89, with matching phase-resolved partial discharge (PRPD) patterns and comparable signal-to-noise ratios to HFCTs. These findings validate the feasibility and advantages of utilizing BCTs for online PD monitoring in transformers and shunt reactors.
No takes yet. Share an insight, caveat, or question.
Chi et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: