This approach reduces operational costs and enhances energy coupling efficiency in multi-village settings, suggesting new planning strategies.
The application of rural micro-energy grids is critical for improving the energy economy and supply quality in rural areas, yet existing planning methods suffer from two key limitations: (1) they focus on single-village scenarios, failing to exploit multi-village resource integration potential; and (2) they rarely address operational uncertainties, which pose risks to the feasibility of planning schemes. To fill these gaps, this study proposes a robust planning method for multi-village coupled rural micro-energy grids (MV-RMEGs). Based on the multi-energy coupling model within the MV-RMEG, a collaborative/autonomous operation framework is developed, which balances energy coupling efficiency and supply reliability. By integrating the information gap decision theory into the established deterministic model, multiple uncertainties in MV-RMEG can be handled without relying on probability statistics. Simulation results from a rural area in North China verify the method’s superiority: compared with single-village planning schemes, the proposed method reduces the power purchasing cost by 99.61%; in off-grid scenarios, it maintains a critical load shedding rate of 3.96%, which is 27.27% lower than the deterministic method. Moreover, the uncertainty handling process leads to a 10.25% reduction in the operating cost of the proposed method when dealing with DG output and load fluctuations.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2025) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: