Analysis identifies waste factors affecting production costs in batching plant, suggesting lean methods for improvement.
In the manufacturing industry, a company's productivity can be seen from its ability to run production processes effectively and efficiently. The problem of inefficient production occurs in the production process, which makes the production time longer and does not meet the targets. This forces operators to work overtime, and the company has to incur additional costs for the overtime operators. This research aims to identify waste and the impacts that affect production cost losses. Several waste factors that have a dominant impact on production cost losses have been identified. The result of this study is a change in the cycle time from before the improvement, which was 21,600 seconds or 360 minutes. After improvements were made to activities that caused waste, the cycle time of the ready-mix concrete production process became 18,600 seconds or 310 minutes.
No takes yet. Share an insight, caveat, or question.
Bone et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: